Baugenehmigung für die Änderung einer Anlage im vereinfachten Verfahren beantragen
Inhalt
Begriffe im Kontext
- Kauf und Verkauf von Immobilien, einschließlich aller Bedingungen und Pflichten im Zusammenhang mit der Besteuerung, dem Eigentum oder der Nutzung von Immobilien (auch als Zweitwohnsitz)
Fachlich freigegeben am
Fachlich freigegeben durch
- § Section 63 of the Hessian Building Regulations (HBO): Building permit-free projects
- § Section 64 of the Hessian Building Code (HBO): Exemption from approval
- § Section 65 of the Hessian Building Code (HBO): Simplified building permit procedure
- § 69 Hessian Building Regulations (HBO): Building application, building documents
- Decree on building documents
If you want to make changes to an installation that requires planning permission but does not require approval and is not exempt from approval, you can submit a building application using the simplified procedure.
As a rule, the modification of installations requiring approval is also subject to planning permission, i.e. you must have a corresponding building permit before carrying out the structural modification.
Exception:
- Changes that do not require a permit within the meaning of Annex II to Section 63 of the Hessian Building Regulations (HBO)
- Changes for which the approval exemption procedure can be used
If a building permit procedure is to be carried out, the building permit for a change is usually granted in the simplified building permit procedure
The building permit expires if you do not start building work within 3 years of the permit being granted or if building work has been interrupted for one year after this period.
The period can be extended by up to 2 years in each case, even several times, with a written application.
In addition to the building application, the documents required for the assessment of the project and the processing of the building application must be submitted to the lower building supervisory authority in analog/digital form.
These documents can be, for example
- Site plan
- Extract from the official real estate map
- Building description
- construction drawings
The documents to be submitted can be found in the Hessian Building Documents Decree.
The structural engineering certificates must be submitted to the building inspectorate prior to the execution of the respective construction phases, the building documents not subject to mandatory inspection prior to the start of construction.
The amount of the fees is determined on the basis of the shell construction costs of the building. A minimum of EUR 7 is set per EUR 1,000 of shell construction costs. The respective municipalities may set different fees by means of bylaws.
- You fill out the application digitally in the building portal or in analog form and submit it together with the required documents to the responsible building authority.
- The building authority will check your application and the documents.
- If all requirements are met, the building authority will grant you the permit.
The duration of the procedure depends on the individual case, including which agencies need to be involved. As a rule, the procedure takes a maximum of 3 months. The procedure can only be extended by 2 months if there are special circumstances.
The building application is deemed to have been approved if no decision has been made within this period.
- Modification of installations, approval in the simplified procedure
- Changes to building structures that do not require a building permit and are not subject to a permit exemption
- the structural changes do not conflict with any public law regulations
- No implementation of structural changes requiring approval without prior issue of a building permit
- Responsible: The lower building supervisory authority (building supervisory authorities of the districts, independent cities and special status cities)
Please contact the lower building supervisory authority (building supervisory authorities of the districts, independent cities and special status cities).