Änderungen bei Fliegenden Bauten anzeigen
Inhalt
Begriffe im Kontext
- Erlangung von Lizenzen, Genehmigungen oder Zulassungen im Hinblick auf die Gründung und Führung eines Unternehmens
Fachlich freigegeben am
Fachlich freigegeben durch
Floating structures are structures that are suitable and intended to be repeatedly erected and dismantled in different places. They require an execution permit (e.g. tent halls, merry-go-rounds) before they are set up for the first time and in use. This is issued by the Testing Centre for Flying Structures (TÜV Rheinland Industrie Service GmbH, Berlin regional area).
The execution permit is granted for a limited period (up to five years) after successful examination of the submitted documents including initial acceptance. It may be extended on request. The execution permit, its extensions and all associated documents are summarized in a bound test book which accompanies the mobile construction at all installation sites.
If there is a significant change to the flying structure, the amendment of the execution permit must be applied for.
The application for amendment of the execution permit must be accompanied by the necessary building documents in duplicate.
(a) construction and operating specifications;
b) construction drawings on paper, on fabric or of equivalent material (clear representation of the entire installation, for example on a scale of 1 : 100 or 1 : 50),
(c) individual drawings of the load-bearing components and their connections, for example on a scale of 1 : 10 or 1 : 5;
d) structural static verifications as well as safety verifications of mechanical parts and electrical installations,
(e) schematics for electrical, hydraulic or pneumatic components or equipment;
(f) drawings of the layout of escape routes and their dimensions, with mathematical evidence for tents with more than 400 visitor seats.
Before the execution permit is granted, the flying structure must be set up for testing. The trial installation may be dispensed with if it is not necessary for assessing the stability or operational safety of the mobile structure.
The execution permit is entered in a test book. A copy of the original construction templates required for the extension test and the acceptance of use and accompanied by an inspection note must be attached to the test book.
The test book must be permanently bound and provided with consecutive page numbers.
The execution permit is valid for between one and five years, depending on the type of plant and execution. It may be extended on request for the appropriate period.