Das neue FIM Portal wird aktiv weiterentwickelt. Feedback senden | Infos zu Datenquellen

Gehwegüberfahrten Änderung

Hamburg 99108015011000 Typ 4b

Inhalt

Leistungsschlüssel

99108015011000

Leistungsbezeichnung

<div lang="en-x-mtfrom-de">Sidewalk crossings change</div>

Leistungsbezeichnung II

<div lang="en-x-mtfrom-de">Request a sidewalk crossing change</div>

Leistungstypisierung

Typ 4b

Begriffe im Kontext

<div lang="en-x-mtfrom-de">Curb</div> (Synonym), <div lang="en-x-mtfrom-de">Subsidence</div> (Synonym), <div lang="en-x-mtfrom-de">curb lowering</div> (Synonym), <div lang="en-x-mtfrom-de">sidewalk</div> (Synonym), <div lang="en-x-mtfrom-de">sidewalk lowering</div> (Synonym), <div lang="en-x-mtfrom-de">sidewalk crossing</div> (Synonym), <div lang="en-x-mtfrom-de">property development</div> (Synonym), <div lang="en-x-mtfrom-de">driveway</div> (Synonym), <div lang="en-x-mtfrom-de">driveway</div> (Synonym)

Leistungstyp

nicht vorhanden

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

nicht vorhanden

Einheitlicher Ansprechpartner

Nein

Fachlich freigegeben am

09.06.2022

Fachlich freigegeben durch

nicht vorhanden

Handlungsgrundlage

§ 7a of the Federal Highway Act (FStrG)
https://www.gesetze-im-internet.de/fstrg/__7a.html
§ 18 Hamburg Road Act (HWG) – Crossings
https://www.landesrecht-hamburg.de/bsha/document/jlr-WegeGHAV10P18

Teaser

You can request a change to an existing sidewalk crossing.

Volltext

Sidewalk crossings are, for example, property driveways or curb cuts. They are used to make a property easily accessible for vehicles from the street.
You need a permit to set up a footpath crossing. Existing footpath crossings can also be modified. You must apply for the change to the responsible authority.
Property access roads require a different type of construction or paving than the sidewalk, regardless of whether they are being constructed or modified. As a rule, work on public roads is commissioned by the city. In exceptional cases, you as the applicant may commission the work yourself from an approved specialist company.

Erforderliche Unterlagen

  • scaled site plan
  • Extract from the property cadastre
  • photos of the location
  • If applicable: cadastral map

Voraussetzungen

  • You are the owner of the property.
  • Alternatively, you have a power of attorney from the property owner.
  • If you are permitted to carry out the modification of the sidewalk crossing yourself: The company you have commissioned is an approved company.
  • The vertical and visual continuity of the walkway is maintained.
  • The change will not result in any interruptions to the sidewalk.

Kosten

50.00 - 800.00 EUR
The costs are divided into an administration fee and production costs. The administration fee and production costs depend on the size and condition of the sidewalk crossing and the need to carry out further measures (for example, planting replacement trees or moving light poles).

Verfahrensablauf

  • You apply for the change of the sidewalk crossing in writing (by post, email, fax) and submit the necessary documents.
  • The responsible body will examine whether there are any reasons against implementing the change.
  • If the requested change is extensive, the responsible authority will organize an on-site appointment in which you will also participate.
  • Once your application has been approved, you will receive a permit and can have the sidewalk crossing changed. If necessary, the responsible authority will set conditions and requirements.
    • The responsible body may also order the change itself. If the responsible body has the work carried out, you do not need to take any further steps.
    • Otherwise, you must commission an approved company to carry out the change. The company must apply for a traffic authority order for the change measure.
  • Based on the production costs, you make an advance payment
  • Once the work is completed, you will receive an invoice for the remaining modification costs and pay them.
  • After completion of the construction work, you will arrange a joint acceptance date with the responsible authority.

Bearbeitungsdauer

The processing time varies from case to case and can take up to several months.

Frist

There is no deadline.

Hinweise

  • You may not alter a pavement crossing yourself without the permission of the responsible authority (for example, with wooden beams or steel ramps). Such alterations constitute an unlawful intervention in the road space. You may be committing a criminal offense.
  • Obtaining a permit to alter the sidewalk crossing does not mean that you will also receive other permits for projects such as building a garage or carport. You must apply for these permits separately.

Rechtsbehelf

  • contradiction
  • lawsuit before the administrative court

Kurztext

  • Sidewalk crossings are property driveways or curb cuts and facilitate access to the property with vehicles.
  • A permit is required to install a footpath crossing.
  • Changes to existing sidewalk crossings must also be requested.
  • Property driveways require a different type of construction or paving than the sidewalk.
  • As a rule, the city commissions the work on public roads. In exceptional cases, the applicant can commission an approved specialist company themselves.

Ansprechpunkt

nicht vorhanden

Zuständige Stelle

Authority for Transport and Mobility Turnaround

Formulare

nicht vorhanden