Beseitigung von Anlagen - Anzeige Entgegennahme

Bremen 99012078261000 Typ 4

Inhalt

Leistungsschlüssel

99012078261000

Leistungsbezeichnung

Beseitigung von Anlagen - Anzeige Entgegennahme

Leistungsbezeichnung II

Displaying the removal of an installation without a permit / Bremerhaven

Leistungstypisierung

Typ 4

Begriffe im Kontext

Brhv (Synonym)

Leistungstyp

nicht vorhanden

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

  • Bauplanung (2050400)
  • Anlagenbetrieb und -prüfung (2120100)

Einheitlicher Ansprechpartner

nicht vorhanden

Fachlich freigegeben am

17.04.2025

Fachlich freigegeben durch

nicht vorhanden

Handlungsgrundlage

Teaser

If you intend to remove an installation that requires planning permission or does not require planning permission, you must notify the lower building supervisory authority at least one month in advance.

Volltext

You must notify the lower building supervisory authority at least one month in advance of the removal of installations that require a building permit or do not require a building permit. If the lower building supervisory authority does not take any building supervisory measures, you can start the removal work after the expiry of the one-month period without further approval.

If the structure to be removed is attached to structures that require planning permission or do not require planning permission, the stability of these structures must be assessed by a qualified structural engineer and verified to the required extent. If necessary, the removal work must be supervised by the qualified structural engineer.

The obligation to notify does not apply to

a) installations not subject to procedures pursuant to Section 61 (1) of the Bremen State Building Code,

b) free-standing buildings of building classes 1 and 3,

c) other installations that are not buildings with a height of up to 10 meters.

These may be removed without a notice of removal.

For the removal of the following structures, you need a building permit in accordance with § 64 of the Bremen State Building Regulations:

a) protected cultural monuments that are entered in the list of monuments or buildings that are located in their vicinity,

b) for the partial removal of a building project that is to be classified as a change to a building structure or

c) if the lower building supervisory authority requires a building permit procedure after examining the notification of removal.

Erforderliche Unterlagen

Voraussetzungen

None.

Kosten

The amount of the fee is based on § 1 of the Construction Costs Ordinance, tariff number 101.09 Notification of the removal of installations and amounts to 1% of the removal costs.

Verfahrensablauf

You submit the notification in text form using the published form. Attach the required documents.

Submit the notification to the responsible lower building supervisory authority. If documents are missing or there are other ambiguities, you will be asked to rectify these obstacles to assessment. In this case, submit the missing or amended documents and/or the clarification.

The lower building supervisory authority will review your notification. If the lower building supervisory authority does not take any further building supervisory measures within one month of confirming receipt of the complete building documents, work can begin after the one-month period has expired.

In the case of non-detached buildings, the stability of the building or buildings to which the building to be removed is attached must be assessed by a structural engineer within the meaning of Section 66 (2) of the Bremen State Building Code and verified to the required extent.

The removal must be supervised by the structural engineer in building class 2 and - where necessary - by the structural engineer for non-detached buildings in building class 3.

The confirmation of stability or proof of stability required in accordance with Section 61 (3) sentence 4 of the Bremen State Building Regulations must be checked by the building authorities in building classes 4 and 5.

§ Section 61 (3) sentences 4 to 6 of the Bremen State Building Code do not apply if the building is attached to a building that does not require a building permit.

Bearbeitungsdauer

The maximum processing time is one month in accordance with Section 61 (3) sentence 3 of the Bremen State Building Code.

Frist

The lower building supervisory authority must be notified of the removal of an installation at least one month in advance. The start of the removal work must be notified to the lower building supervisory authority at least one week in advance with the "Construction start notification".

Weiterführende Informationen

Hinweise

Building activity statistics online

  • The survey form for building permits or the disposal/removal survey can be filled out online or printed out on Bautätigkeitsstatistik Online (statistik-bw.de). You can find the link under "Further information" - "Where can I find out more?" - "Construction activity statistics online".

Overview of the legal bases

  • You can also find a link to an overview of the legal bases under state and municipal law under "Further information" - "Where can I find out more?" - "Overview of the state and municipal legal bases" .

Rechtsbehelf

nicht vorhanden

Kurztext

Ansprechpunkt

nicht vorhanden

Zuständige Stelle

nicht vorhanden

Ursprungsportal